In a bid to generate more revenue through freight transportation, the South Central Railway (SCR) has decided to develop a new Gati Shakti Multi Modal Cargo Terminal (GCT) Gadchandur railway station (at Secunderabad Division.) As per information, the new terminal will be developed at an estimated cost of Rs 15,2 crore at Gadchandur railway station. The development work will be carried out by M/s Dalmia Cement Bharat Limited, which secured the tender issued by the zonal railway, said report. Under the contract, which has been signed for a period of 35 years, the construction and maintenance of the terminal will be performed by M/s Dalmia Cement Bharat Limited, Chandrapur. No terminal fees will be assessed on cargo for which the GCTO himself is the consignor or consignee. The railways will be responsible for paying all operational and maintenance costs associated with a variety of assets, including overhead equipment, signal, track, and communication charges, added reports. The latest signed contract also includes the installation of an additional rail line, building a covered shed, laying concrete, installing a Hamali lavatory, building an electronic in-motion weighbridge, building an approach road, and setting up a water supply. Additionally, electrification of additional tracks and the installation of FOIS and TMS will also take place as part of the project.