To meet growth in cargo volumes, construction work at 77,000 sq. ft cargo facility has started at Pittsburgh International Airport. The cargo facility is scheduled to open in 2024 and will include 69,000 sq. ft. of warehouse space and 7,300 sq. ft. of office space across two floors. The building will feature 17 loading docks for trucks; most will come with dock levellers, while others will be used specifically for Unit Loading Devices (ULDs). Flatbed trucks will be able to access the interior of the warehouse with a dedicated loading dock, which is advantageous in poor weather. Dedicated areas in the facility will be able to segregate goods deemed valuable, vulnerable, or hazardous. It will also have expansion capabilities to hold more equipment for special cargo and accommodate temperature-controlled goods. In addition, the building’s design includes additional space for security screening, particularly for international cargo. It will be able to serve two Boeing 747-8 freighters side by side, or up to four Boeing 757-200s at once.