Express distribution leader Gati has ramped up its network capacity by 25% by adding 100 line haul trucks to its innovative flexi network to connect the demand locations. Thus, Gati aims to cut down the dwell time further in view of the huge spike in demand during the festival season, billed as the stress-test time for supply chain players.
The additional trucks in the special flexible network based on the market and route dynamics, will connect the key locations to ease the pressure of servicing the demands. The network will reduce dwell time from existing 9% to 5%. As many as 19 such grid locations including Delhi/NCR, Mumbai, Bangalore, Ahmedabad, Hyderabad, Chennai, Pune, Indore and Kolkata have been identified for the purpose.
“We are ready for the festival ride and meet the increased demand during the upcoming season. The network capacity will be enhanced by 20-25% while the workforce will be strengthened by at least15%. We are planning to leverage at least 20% of existing facilities further to manage the peak season load. Overall, we expect a 15% increase in productivity per person. We are tech enabled, especially in the area of artificial intelligence, to meet the purpose. We have set up a monitoring system already in place to ensure a better transit time for the customers. Our aim is to ensure a delivery efficiency of 95%+,” said Charles Devlin D’Costa, Chief of Supply Chain Operations, Gati KWE